RemitScanLive mapMarket IntelligenceCoverageMethodologyBlog
Blog/Case study
Case study · Late UMM

Anatomy of a Late UMM

A walk-through of a real late-disclosure flag — from ENTSO-E outage detection to materiality scoring — with counterparty details redacted.

16 May 2026·RemitScan·Counterparty redacted
This is a representative sample. Asset name, counterparty identity, and source record IDs are anonymised. Interactive actions (acknowledge, dispute, export) are available to subscribers only.
a1b2c3d4LATE UMMHIGHOPENRaised 14 Jan 2026 09:25 UTC

450 MW forced outage at Coastal Gas Turbine Unit [REDACTED] — UMM published late

Asset EIC 48W00000XXXXX-001Fuel gasBidding zone 10Y1001A1001A82HTSO 50Hertz

Why this was flagged

An unplanned 450 MW forced outage was recorded on ENTSO-E Transparency Platform at 06:02 UTC on 14 January 2026. Under Article 4.1 of REMIT Regulation 1227/2011, the responsible Market Participant was required to publish an Urgent Market Message to an authorised IIP within 60 minutes — by 07:00 UTC. No qualifying disclosure was found until 09:23 UTC, when a UMM was published on the EEX UMM Hub, 203 minutes after the outage was first observed. The 143-minute overshoot of the disclosure window, combined with the asset's MW output relative to the DE bidding zone's available generation capacity, yields a materiality score of 78.5.

Signal vs. Disclosure

OBSERVED
Record ID
TP-2026-DE-XXXXXX
Event type
Unplanned — forced outage
Start
14 Jan 2026 06:00 UTC
Detected
14 Jan 2026 06:02 UTC
MW
450
Cause
Mechanical failure (component redacted)
Expected return
14 Jan 2026 18:00 UTC
Last edit
14 Jan 2026 06:05 UTC
1 CANDIDATE
EIC: 48W00000XXXXX-001
MP: [REDACTED]
Tolerance: 60 min
Inside-Information AG0
EEX UMM Hub1
Nasdaq UMM Hub0
JAO0

Materiality Score

78.5
Zone capacity impact34.2 / 40
Portfolio share22.8 / 30
Price impact (DA)16.2 / 20
Duration5.3 / 10
deterministic · reproducible

Event Timeline

Forced outage begins (ENTSO-E TP)14 Jan 06:00
RemitScan detects TP event14 Jan 06:02
REMIT 60-min deadline passes14 Jan 07:00
UMM published on EEX (203 min late)14 Jan 09:23
Flag raised by RemitScan14 Jan 09:25

Evidence Pack — Table of Contents

5 artefacts · export available to subscribers
ENTSO-E TP outage recordSource record · parsed 2026-01-14T06:02Z
IIP search log (4 platforms)60-min window · Inside-Information AG, EEX, Nasdaq, JAO
UMM text (EEX, redacted)Published 2026-01-14T09:23Z · delay 203 min
Materiality worksheetAL-METH-2.5 · score 78.5 / 100
Methodology referenceVersion AL-METH-2.5 · reviewed 2026-05-16
See this in your portfolio
Get your own flag inbox, evidence packs, and disclosure quality scores.